Faq
Q&A (common question and answer)
Q3. How much costs to build a house (house)? |
A3:
As there were really various cases even if I said a total cost when I built a house (house), I could not answer it so that a person died at all, but provided the cost (table 1) of the building total construction cost when I built the wooden construction house of the floor space 40 tsubo as an example here.
As various expenses (table 2) are caused as well as this building total construction cost when I build a house, in reference to two lower tables, please put up an approximate financial plan.
■Table 1: Building total construction cost when I build the wooden house of the floor space 40 tsubo
Kind of the expense | Expense | Contents | The payee | ||
Based * All-out ko Thing hi |
Building construction cost | 24 million yen | 600,000 yen / tsubo X 40 tsubo. Tsubo unit price 600,000 yen is just a reference example. The tsubo unit price changes by grade, others of structure (wooden construction, steel-frame building, concrete building, others) and use materials. In addition, built-in furniture, air-conditioner include the expense in this building construction cost. | Building company | |
Landscape gardening construction cost | 1,200,000 yen | Approximately 5% of building construction costs. | Landscape gardening company | ||
Curtain, Window shade construction |
480,000 yen | Approximately 2% of building construction costs. | Interior company | ||
Design control charges | 2,400,000 yen | Design, control charges of this case are 10% of the building construction cost. But please see A1 in detail as the design, control charges vary according to the amounts of money of the building construction cost. | Drawing office | ||
Consumption tax | 2,246,400 yen | *8% of totals (28,080,000 yen) of the amount of money mentioned above | Taxation office | ||
The total | 30,326,400 yen |
The amount of money of the upper table is an approximate indication.
■Table 2: Miscellaneous expenses (※) except the building total construction cost when I build the wooden house of the floor space 40 tsubo
Kind of the expense | Contents | The payee | |
Tax Money ・ The up Note hi |
The stamp duty | I attach it to a construction contract contract | Taxation office |
Real estate acquisition tax | For the acquisition of the real estate (a house and land), it is the tax that the metropolis and districts of the location of the real estate impose on an acquisitor of the real estate. . |
Metropolis and districts tax office | |
Registration and license tax | When I build a house, the land and purchased it, I perform the preservation registration, the registration of a transfer of proprietary rights. It is registration and license tax to be necessary for this registration application. | Legal Affairs Bureau | |
Registration fee | The indication registration (land and house investigator reward) | Land and house investigator | |
The preservation registration (judicial scrivener reward) | Judicial scrivener | ||
The mortgage setting registration (judicial scrivener reward) | Judicial scrivener | ||
House House ro | Hmm Hand zoku Come hi Business |
The stamp duty | Taxation office | |
Financing fee | Fee to pay to the borrowed money | Borrowed money financial institution | |
Fire premium ・ Earthquake premium |
When I borrow a home loan, participation to fire insurance is a requirement. In addition, I join the earthquake insurance together unless I do not hope in particular. | Nonlife insurer | |
Judicial scrivener reward for mortgage setting | The expense that is necessary when I set mortgage to a house or the land using a home loan. | Judicial scrivener | |
so Of this Others hi Business |
Moving charges | Mover | |
Oversized garbage disposal costs | Garbage disposal supplier | ||
Telephone transference costs | Phone company | ||
Water supply admission fee | The municipalities | ||
Building dismantling costs | Only in the case of rebuilding | Housebreaker | |
Temporary house expense | Only in the case of rebuilding | Apartment owner | |
Registration fee | The loss registration (only in the case of rebuilding) | Land and house investigator |
(※) About the miscellaneous expenses except the building total construction cost, the possibility that the taxation system changes and various cases are so in there being it
I do tei and do not specify an amount of money.
For more information about each expense, ask the window of each payee.
In addition, is a very careless calculation method, but as how to put out miscellaneous expenses except the building total construction cost,
From approximately 10% of building construction costs (in the case of the example mentioned above 24 million yen) around 15% (in the case of the example mentioned above quite
From 2400000 yen to 3600000 yen should have) use as an indication. But this is K, too
Please note that you vary according to su.
Inquiry foam is this>>